Install Rooftop Solar plant

Lacs will be save

(Inclusive of all Taxes)

Subsidy on Solar available

Grid-Tie Saving
As the government is readily promoting solar energy, the authority has proposed several benefits for solar buyers with attractive subsidy schemes. In this , you will learn about solar system subsidy. And how to avail the government subsidy for a rooftop solar system for your home.

What is the Rooftop Solar plant subsidy ?

The government provides a subsidy for homeowners to install rooftop solar panels with a capacity of 1kW to 10kW. The subsidy amount varies based on the capacity of the solar system. 

Project Capacity in Individual Household Revised for General States/UTs Revised for Special* Category States/UTs
1 – 3kWRs 18,000/kWRs 20,000/kW
Above 3 – 10 kWRs 9,000/kWRs 10,000/kW

*Special Category States: North-Eastern States including Sikkim, Uttarakhand, Himachal Pradesh, UTs – J&K, Ladakh, Lakshadweep and Andaman & Nicobar Islands.
A 3kW Solar System is commonly considered the optimal choice for residential solar installation.

Subsidy Opportunities Provided by Government for Solar Systems

For rooftop solar in residential sector the central financial support has been increased upto Rs.18000/KWp from previous Rs.14,588/KWp for project up to 3KW and Rs. 9000/Kwp from Rs. 7294/- for project above 3KW and 10KW. New rates are applicable for all claims in National Portal.

What size solar system should you install?

What size solar system should you install?

GRI min

Remember this 3 Thumb rule system

For example: If your bill comes to 5000, then a system of 5kW should be installed.

Example: Sanctioned load – 5kW

Maximum Solar Plant Allowed – 4kW

Sanctioned load will have to be increased for bigger size

Example – Shadow free area on your roof – 1800 Sqr Feet

Maximum plant you can install – 18kW

Whichever of these three has the least value, the solar system of the same size should be installed by you.

Why to choose UTL Solar

Why do most solar plants fail?

Most common mistake for failure of Solar Plants

Image 01
Image 02
Image 03

Because after getting the goods from different company Everyone starts blaming each other. No one takes responsibility when something is damaged.

LIFE OF SOLAR SYSTEM

LIFE OF SOLAR SYSTEM

3

Panel

25 Years Warranty

4

Inverter

10 Years Warranty

5

Installation Material

10 Years Warranty

Image 04

The brand which is established in the market for 28 years is more likely to stay in the market for the next 25 years

111 e1654178654199

SINGLE SOURCE SOLUTION

SINGLE SOURCE SOLUTION

10

Grid Tie Inverter

11

Solar Panel

12

Installation Accessories

13

So, always take everything from the same company

LOGO1 min
GRID T min

WHY UTL SOLAR INSTALLATION IS BETTER?

UTL Solar always uses premium quality material for installations which neither gets spoiled quickly nor costs you much. Also, you get 10 years warranty on UTL solar installation, meaning you don't need to worry about your solar system at all.

Grid 33 min min
Grid 35 min min

We use
Certified Material

Grid 34 min min
Grid 36 min min

UTL ON GRID SOLAR INVERTER

UTL Solar inverters are known for their advanced rMPPT technology and high efficiency. They generate 30% more electricity than a normal solar inverter.

Grid 40 min 1536x682 min

India’s Most Preferred Solar Inverter Brand

1 min 3 min

Procedure for Applying for Solar Subsidy

In order to complete the net metering process after solar installation, it is necessary to provide essential information such as system specifications, details about the solar panel and inverter manufacturers, and other relevant information to the electricity department.

  • There are two methods to submit an application for a solar connection: online and offline.
  • Reach out to the Power Distribution Company (DISCOM) for assistance.

Here’s simple process you can follow:

  • Seek advice from our experienced solar engineers.
  • Brief your plan to them.
  • Buy a solar system and installation.
  • Apply for net metering.
  • Submit the application to the authority.
  • Receive the Solar Subsidy after 30 days.

ABOUT UTL SOLAR

Manufacturing Units
3
Years Old Brand
28
Strong R&D Team
60 +
Product SKUs
500 +
Manufacturing Units
3
Years Old Brand
28
Strong R&D Team
60 +
Product SKUs
500 +
Distribution Network
5000 +
Service Engineers
400 +
Rooftop Solar Installed
1 GW+
Satisfied UTL Customers
50 L+
Distribution Network
5000 +
Service Engineers
400 +
Rooftop Solar Installed
1 GW+
Satisfied UTL Customers
50 L+

SOME OF OUR PRESTIGIOUS CLIENTS

Disclaimer: The logos are the property of their owners and are used for identification purposes only

Fill the form to book the Site Survey

Client Details
By filling above detail I am allowing Fujiyama Power Systems Limited to send me related SMS and Email.
Shopping Cart
Scroll to Top