A Comprehensive Guide to Solar Panel Subsidy in Uttar Pradesh

Since fossil fuel prices have increased, the cost of producing power has risen. To cut costs, individuals are searching for alternate sustainable energy production techniques these days. Installing a solar power plant is one of the greatest alternatives that have emerged in this regard if you are located in Uttar Pradesh. UP’s geographical position provides the whole year with abundant solar radiation. Also, the government here offers attractive solar panel subsidy, so things are a whole lot cheaper.

Do you want to know what the solar panel subsidy in Uttar Pradesh is and ways to have your home’s rooftop solar system subsidized by the government? Then your click was correct.

What is the Solar Panel Subsidy Program in Uttar Pradesh?

The Uttar Pradesh (UP) government is offering a solar panel subsidy for homeowners who install solar photovoltaic (PV) systems on their houses. The goal is to promote the adoption of renewable solar energy at the residential level.

Subsidies will be provided for solar panel systems with capacities starting at 1 kilowatt (kW). The subsidies will cover a percentage of the total cost of purchasing and installing the solar panels, inverters, and other system components.

In general, a 3kW solar system is the best choice for rooftop solar systems on houses. A 3kW solar system is generally considered the best for homes because a 3kW solar panel system is adequate to meet the daily electricity requirements of most homes.

Solar Panel Subsidy in Uttar Pradesh

Families in Uttar Pradesh have the chance to lower the cost of solar panel systems and get electricity for their homes at zero cost. Under the Rooftop Solar Program Phase II, you can get Central Financial Assistance (CFA) or Solar Subsidy Support of a set amount for every kW in your system. This scheme benefits only residential consumers and housing societies.

For rooftop solar panel systems in the residential sector, the central financial support has been increased up to ₹18,000/kW from the previous ₹14,588/kW for solar power plant projects up to 3 kW and ₹9,000/kW from ₹7,294 for solar power plant projects above 3 kW and up to 10 kW.

Subsidies on Residential Solar Rooftop Plants in Uttar Pradesh

Solar Plant Size (kW)CFA (₹)UP State SubsidyTotal Subsidy in UP
1 kW Solar System₹14,588.00₹15,000.00₹45,000.00
2 kW Solar System₹29,176.00₹30,000.00₹90,000.00
3 kW or above Solar System₹43,764.00₹30,000.00₹1,08,000.00

Note: Only after your installed RTS plant has passed the inspection and commissioning, which will integrate the net metering mechanism, does approval on a CFA/subsidy application proceed. CFA/subsidy is determined according to the total solar system capacity, as approved by your local DISCOM.

What size of solar panel system is needed to be installed?

When looking to install a solar panel system on your home, it is important to correctly size the system. But how will you know what size solar panel system you need to install in your home?

The optimal solar panel system size depends on three main factors:

Electricity Usage: The solar panel capacity should match your home’s electricity usage, as reflected in your monthly electricity bills.

For example, if your total electricity bill is Rs. 5,000, a 5 kW system ought to be installed.

Sanctioned Load Limit: The amount of load sanctioned by your electricity board also determines solar capacity limits. The solar system installation process uses only 80% of the sanctioned load.

For example, if you have a sanctioned load of 5 kW from the utility company, then your rooftop solar system size should not exceed 80% of that limit, which is 4 kW. Exceeding this requires a sanctioned load upgrade.

Available Roof Space: Maximum Plant Size (kw) = Shadow-Free Area (sq. ft.) /100

For example, if you have 1800 square feet of shadow-free space on your roof, the largest solar power plant you may install is 18 kW.

In summary, size your planned solar panel system based on:

  • Monthly electricity expenditure
  • Existing sanctioned loads
  • Available roof area

Whoever has the least value among these three should have a solar system of that size installed.

10 Points Before Buying a solar panel system in 2024

Reasons why UTL solar installations are better than others?

A common reason for any solar power plant failure could be its products, like solar panels, inverters, or even the installing engineers who did not install the solar power plant properly. In such cases, no one is ready to admit their mistake and blame each other. UTL Solar takes care of all this so that you do not have to face such troubles in the future.

For installations, UTL Solar always chooses top-notch materials that don’t break easily or cost a lot of money. Additionally, UTL solar installation comes with a 10-year guarantee, so you won’t have to worry about your solar system at all.

How to Apply for Solar Panel Subsidy in Uttar Pradesh in 2024?

To apply for solar panel subsidy in Uttar Pradesh, you have to upload installation reports (details of the solar system, manufacturer’s information on the inverter and panel, etc., and necessary photographs like earthing process and lightning arrester potential blocker structure photos) after setting up net metering grid-connected solar systems.

Step 1:

Apply for Solar: There are two ways to apply: online and offline. Apply in whichever way you are comfortable.

Step 2:

If you live in Uttar Pradesh and are a resident of Uttar Pradesh, DISCOM details can be found here. The list of 8 DISCOMS in Uttar Pradesh is listed below:

  1. Paschimanchal Vidyut Vitran Nigam Limited.
  2. U.P. Power Corporation Limited.
  3. Dakshinanchal Vidyut Vitran Nigam Limited.
  4. Noida Power Company Limited.
  5. Kanpur Electric Supply Company Ltd.
  6. Torrent Power Limited.
  7. Purvanchal Vidut Vitran Nigam Limited.
  8. Madhyanchal Vidyut Vitran Nigam Limited.

What is the entire process for applying for the solar panel subsidy in Uttar Pradesh?

To apply for a solar panel subsidy in Uttar Pradesh in 2024, you can follow the following steps:

Step 1: Site Survey. Book Engineer Visit.

Step 2: Systems Capacity, Costing and Performance Assessment

Step 3: Buy Solar System and Installation

Step 4: Apply for Net Metering

Step 5: After 30 days of rooftop solar panel installation, one can apply for the solar subsidy.

Know more: Rooftop Solar Panel Subsidy in India

Conclusion:

Many households are beginning to see that switching to solar is a win financially, economically, and environmentally. Finally, with the spur of the solar panel subsidy scheme alongside it, installing a solar panel system can fit any home and budget in Uttar Pradesh.

On the other hand, government subsidies are only available until RTS installations reach 40GW. To promote sustainable growth and development, the world is turning towards renewable alternatives. For this reason, right now is the best time to use solar PV technology in your own home.

FAQs:

क्या उत्तर प्रदेश में सोलर सब्सिडी उपलब्ध है?

हां, उत्तर प्रदेश सरकार सोलर पर सब्सिडी देती है।

3 किलोवाट सोलर पैनल लगवाने में कितना खर्चा आयेगा?

3kW सोलर पैनल लगवाने का खर्चा, पॉली पैनल के साथ 2 लाख 7 हज़ार और मोनो पैनल के साथ 2 लाख 16 हज़ार आता है।

सोलर पैनल में सब्सिडी क्या होता है?

सरकार की तरफ से सोलर पैनल लगवाने पर कुछ पैसों की रियायत दी जाती है, जो आपके बैंक अकाउंट में पैसा सरकार भेजती है।

5 किलोवाट सोलर पैनल में कितना खर्चा आता है?

सिंगल फेस पॉली पैनल के साथ 3 लाख 25 हज़ार और मोनो पैनल के साथ 3 लाख 35 हज़ार तक का खर्चा आता है

10 किलोवाट का सोलर पैनल लगवाने में कितना खर्चा आता है?

पॉली पैनल के साथ 6 लाख तक और मोनो पैनल के साथ 6 लाख 30 हज़ार तक का खर्चा आता है

सोलर प्लांट लगाने के लिए कितनी जमीन चाहिए?

ये डिपेंड करता है की आप कितने kW का लगवाना चाहते हैं। उदाहरण के लिए 2kW के लिए 200sqft का जगह चाहिए।

सोलर पैनल कितने साल तक चलता है?

सोलर पैनल 25 साल या उस से भी अधिक समय तक चल सकता है, अगर उसका मैनेटेनेंस अच्छे से किया जाए।

1 किलोवाट सोलर पैनल की कीमत क्या है?

1kW सोलर पैनल की कीमत 70,000 के करीब पड़ती है

1 किलोवाट के सोलर पैनल से क्या क्या चला सकते हैं?

अगर घर् का मीटर 1kW का है तो वो 1kW तक का पूरा लोड चलाएगा

कितने किलोवाट का सोलर पैनल लगवाने पर एसी चला सकते हैं

ये डिपैंड करता है की आपको AC कितने घंटे चलाने हैं… अगर on-grid है तो 2-3 kW का सोलर पैनल लगवाना पड़ेगा